Early Suppression Fast Response Sprinklers

Early Suppression Fast Response Sprinklers
Product Introduction:
forede Early Suppression Fast Response Sprinklers are installed in places where the slope of the building roof or ceiling does not exceed 170mm/m. The sprinkler splash plate must be installed parallel to the ceiling or ceiling. The nozzle spacing should not be less than 2.4m and should not be greater than 3.7m. When the height of the protected object is greater than 7.5m or the clearance height of the protected space is greater than 9m, the nozzle spacing should not be greater than 3m.
Send Inquiry
Description
Technical Parameters

The Induction of Early Suppression Fast Response Sprinklers

forede Early Suppression Fast Response Sprinklers is mainly used to protect most common materials for film-coated packaging or non-coated packaging, including non-foamed plastics packaged in cartons. The maximum stacking height of the product is 12.0m. It can also be used in cylindrical packaging paper product warehouses. And protection of rubber tire warehouses. The fusible connection component is connected by two equal-length connectors through a thin welding layer. When a fire breaks out and reaches the operating temperature, the solder joints melt, the two equal-length connecting bars are separated, and the sprinklers are started to sprinkle water.


The Specification of Early Suppression Fast Response Sprinklers

K FACTORK14@US(202@Metric)
Thread SizeDN20(3/4")
Connecting ThreadBSP(NPT Optional)
Main MaterialBrass
Sensitive Element Fusible Alloy
Seal Material NBR(Teflon Optiona)
Surface Finishing
Natural Brass
Temperature74°C,100°C


The FAQ of Early Suppression Fast Response Sprinklers


Q1:Do you have any MOQ limit of Early Suppression Fast Response Sprinklers?
For conventional Early Suppression Fast Response Sprinklers, Low MOQ, OEM Early Suppression Fast Response Sprinklers request 30-40days.


Q2:How do you deliver the Early Suppression Fast Response Sprinklers and how long does Early Suppression Fast Response Sprinklers take to arrive?
We usually deliver mass Early Suppression Fast Response Sprinklers order by sea and air, delivery time is depended on the carrier,urgent trail order of Early Suppression Fast Response Sprinklers usually deliver by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Railway also optional.

Q3: Is it OK to OEM ?
Yes. Please inform us formally before our production and confirm the design and other requirements firstly .

 

Hot Tags: early suppression fast response sprinklers, China, manufacturers, suppliers, wholesale, price, Extended Coverage Quick Response Sprinklers, Breeching Inlet, Automatic Fire Fighting Monitor, Pendent ESFR Fire Sprinklers, Fire Hydrant System Fire Fighting, K17 Fire Sprinkler Heads

1)Use the fusible alloys as sensitive components has stable performance, precise operating temperature, and fast response speed.

2)By installing ESFR sprinkler heads in the overhead system, the layered sprinkler heads on each shelf can be eliminated, thus simplifying the system and saving investment costs.



Send Inquiry
Quanzhou Forede Firefighting Equipment Co.,Ltd
contact us