FOREDE Diaphgram Type Deluge Valve
Deluge Valves are used in conditions that require for quick application of large volumes of water and, for that reason, are often integral components in fire protection systems.It delivers large quantities of water, over a large area, in a relatively short period of time. They are commonly used in fixed fire protection systems whose pipe system is empty until the deluge valve distributes pressurised water from open nozzles or sprinklers.
|
Material |
Body |
Ductile iron |
|
Diaphragm |
NBR rubber |
|
|
Pipes |
Stainless steel 304 pipe,cooper pipe |
|
|
Ball valve & strainer & check valve |
Brass |
|
|
Water motor gong |
Stainless steel 304 |
|
|
Working pressure |
12 bar |
|
|
Sealing testing pressure |
24 bar |
|
|
Applicable temperature |
4°C to 70°C |
|
|
Installation |
Vertically or horizontally |
|
|
Flow switch contact capacity |
DC24V,0.5A |
|
|
Solenoid valve Voltage |
DC24V |
|
|
Connection |
Flange × Flange |
|
|
Available Size |
DN50 thru DN250 (2" thru 10") |
|
FAQ
Q:How long does it take to produce the product?
A: Conventional products and small quantities can be produced within 15 days. The specific production time needs to have specific products and product quantities to confirm.
Q:What about the lead time?
A:Sample needs 7-15 days, mass production time needs 30-40 days for order quantity more than 1 container.
Q:Do you have any MOQ limit?
A:For conventional products, Low MOQ, OEM products request 30-40days.
Q: Is it OK to OEM ?
A: Yes. Please inform us formally before our production and confirm the design and other requirements firstly .
Q: Do you offer guarantee for the products?
A: Yes, we offer 1 year warranty to our products.
Hot Tags: hydraulic deluge valve, China, manufacturers, suppliers, wholesale, price, Groove End Deluge Valve, Groove Type Deluge Valves, Deluge Valve For Fire Protection, Flange Type Dry Alarm Valve
1) Ductile iron construction valve body,less weight and extra strength.
2) Available for electric operation,hydraulic operation,manual operation.
3) The all moving parts can be serviced without removing the valve from the installed position.
4) Simple design for easy installation and operation.
5) Vertical or horizontal installation.
6) CCCF certificated.










